The project includes construction of collecting and reserving raw and drinkable water concrete tanks of the Sangan Iron Ore Mines in khorasan province. It was completed in 2006. The capacities of collecting tanks equal 350 cubic meters of drinkable water and 9000 cubic meters of raw water; besides, the capacities of the reserving tanks equal to 700 cubic meters of drinkable water and 20000 cubic meters of raw water, there is also another 2000-cubic meter tank.
For more images please visit the photo gallery of the website.